ERA 8 Network BritainDEVELOPMENT SERVICE

ERA 8 · NETWORK BRITAIN

ROAD TO V0.2

Every railway has its calling points.
These are mine on the way to a playable test build.

DESTINATIONV0.2Playable test buildFor our testers
Loading reviewed progress…

Checking the published roadmap

Loading calling points…

THE DEVELOPMENT SERVICE

Calling points

Select a stop for details

ALONGSIDE THE MAIN LINE

The modules behind the railway

These systems develop alongside the road to V0.2, with their own versions. A version number records development; it does not mean every test or feature is complete.

PhysXV0.01In the V0.1.4 source combination

Train movement, coupling and physical railway behaviour.

Power and SignallingV0.01In the V0.1.4 source combination

Power, point operation and railway protection. Further operating work continues towards the tester build.

TunnelsV0.1In the V0.1.4 source combination

Native tunnel construction, portals and approaches. Wider validation continues.

AIVersion unassignedFurther development

Planned after the joint map review; automatic railway operation remains development work.

Earlier identity: V0.01. Outside the current source combination.

Spline and trackVersion unassignedFurther development

Track geometry, connected railway construction and native editing tools.

SoundVersion unassignedFurther development

Railway sound and atmosphere. A module version has not been assigned.

DatabaseVersion unassignedFurther development

Persistent railway and world state, saving and reloading.

ConstructionVersion unassignedFurther development

Placing and developing the railway and its buildings.

BridgesV0.01Separate module · Source draft

Bridges 0.01 is a separate module. Part 1 is a modular masonry viaduct source draft, before game integration.

Reviewed development snapshot · Select a module for its development note. Module work supports the milestones above; it does not replace them.

ERA 8 / 02

A working railway. A reason to improve it.

Build a useful line, operate its services, understand the results and make the next improvement. The wider freight, depot and connected-world design keeps its own development scope.